Aluminum Fitting Scaffolding System – Access Technology

Forno de Pirólise | Bahia | 2017

50%reduction in assembly time and team risk exposure

Service

Inside access structure assembly and disassembly, in a petrochemical’s industry pyrolysis furnace radiation area, in addition to services of coating and surface treatment with industrial painting.

Solution

For its lightness, ease and quick assembly and innovative features, such as the floor with trapdoor and built-up staircase, the Aluminum Fitting Scaffolding System was the solution adopted for this project.
Efficiency in assembly and disassembly enabled great results of time, labor and cost, reducing its execution from two to only one working day, thus reducing equipment downtime by 50%.
The pictures show details of the structure of this work carried out in a confined space: access platform without gaps or levels, floors with fast security locks, trapdoor and integrated staircase.

Download PDF

Highlights

Isolamento Térmico Removível – Substituição de jaqueta térmica em turbina a gás de usina termelétrica

Jan | 2018

96 kg/m³de manta fibra cerâmica e tecido de fibra de vidro

Read more
Highlights

SafeCool and WCM-Welding Control Module. The new Habitat equipment that ensures enhanced productivity

May | 2017

NR15 without restrictions

Read more
Highlights

Suspended Platform: The advantages of use of Web PrinerDeck in Offshore Maintenance

March 2017 | Campos Basin | RJ

29kg/m² of aluminum and steel material

Read more
Highlights

Ideal for safe work in explosion risk areas

Offshore oil production rigs, refineries, industrial plants and petrochemical terminals.

Flame retardant PVC

Read more
Highlights

Mobilization and Synergy in Rig Maintenance Ocean Worker Rig

Plataforma Ocean Worker | Rio de janeiro | 2013

Involving a team of 157

Read more
Highlights

Thermal Insulation in Refineries

Refineries Abreu e Lima Refinery | Pernambuco | 2014

27 thousand m² of thermal insulation

Read more
Highlights

Steel Access Structures on the P-62

P-62 Rig | Pernambuco | 2012 – 2014

850,000 man hours involving exposure to risk

Read more