Forno de Pirólise | Bahia | 2017
Inside access structure assembly and disassembly, in a petrochemical’s industry pyrolysis furnace radiation area, in addition to services of coating and surface treatment with industrial painting.
For its lightness, ease and quick assembly and innovative features, such as the floor with trapdoor and built-up staircase, the Aluminum Fitting Scaffolding System was the solution adopted for this project.
Efficiency in assembly and disassembly enabled great results of time, labor and cost, reducing its execution from two to only one working day, thus reducing equipment downtime by 50%.
The pictures show details of the structure of this work carried out in a confined space: access platform without gaps or levels, floors with fast security locks, trapdoor and integrated staircase.